Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherClosing soon

PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222

DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST SEATTLE

Response deadlineOct 8, 2026 4:00 PM EDT · 2 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 8, 2026 4:00 PM EDT · 2 days left
Posted
Sep 25, 2026 12:00 AM EDT
Notice type
Special Notice
PSC
Y1AZ — Construction Of Other Administrative Facilities And Service Buildings
Place of performance
Washington
Current status
Closing soon

Notice details

Official status
Closing soon
Normalized group
Other
Notice ID
4ca158ffc3d24a9b83429ee9612c50a9
Solicitation number
W912DW27RA017

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 26, 2026 2:10 AM EDT.

USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc. c) Removal at ~ 90% removal of building mechanical – electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical – electrical systems g) New Thermoplastic Polyolefin (TPO) Roof system h) Painting of exteriors Other considerations for site work coordination: i) New utility connections (mostly by other entities) j) Shared construction boundaries with adjacent current and future projects

Attachments

1 attachment reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Cassandra Gonzalez
Primary
cassandra.p.gonzalez@usace.army.mil
Phone: 2065073218
Shawna West
Secondary
shawna.west@usace.army.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.