Bid opportunityClosed
Split-Unit HVAC Replacement
DEPT OF DEFENSE › US SPECIAL OPERATIONS COMMAND (USSOCOM) › HQ USSOCOM
Response deadlineSep 24, 2026 1:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 24, 2026 1:00 PM EDT
- Posted
- Sep 17, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- PSC
- N041 — Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
- Place of performance
- Joint Base Lewis McChord, Washington
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- 73d9faa0a3804645be6d3561ac8a51ff
- Solicitation number
- H9242126QE047
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 18, 2026 10:23 PM EDT.
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT). A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. An escort is required for the site visit and will be provided by the Government. Point of contact for the site visit is CPT Megan Colpo (925) 917-0784. Contact the POC for assistance with directions and notify her of arrival due to the escort requirement. Personnel that do not have access to JBLM must go through the Visitor Center at Liberty Gate to receive a visitor's pass. Requirements for the visitor's pass includes REAL ID (passport and social security card for those that do not have a REAL ID), valid driver's license, and vehicle insurance information. Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards. The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.