Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosed

Split-Unit HVAC Replacement

DEPT OF DEFENSE › US SPECIAL OPERATIONS COMMAND (USSOCOM) › HQ USSOCOM

Response deadlineSep 24, 2026 1:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 24, 2026 1:00 PM EDT
Posted
Sep 14, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
PSC
N041 — Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Place of performance
Joint Base Lewis McChord, Washington
Current status
Closed

Notice details

Official status
Closed
Normalized group
Bid opportunity
Notice ID
442ab46e6d234224a8908fe5f1ce9a2a
Solicitation number
H9242126QE047

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 15, 2026 10:23 PM EDT.

All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT). A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards. The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.

Attachments

3 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

SSG Jermaine Sharples
Primary
jermaine.t.sharples.mil@socom.mil
CPT Michael Adams
Secondary
michael.a.adams.mil@socom.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.