Foster Spillway Gate Nut Replacement and Re-Tensioning
DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST PORTLAND
Response deadlineSep 1, 2026 6:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 1, 2026 6:00 PM EDT
- Posted
- Aug 24, 2026 12:00 AM EDT
- Notice type
- Sources Sought
- Set-aside
- Not provided or not applicable
- NAICS
- 237990
- PSC
- Z2KA
- Place of performance
- Oregon
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Market research
- Notice ID
- 69362607098c4e5dbc6b91ae7872ac9e
- Solicitation number
- PANNWD-26-P-0000033137
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 25, 2026 5:16 PM EDT.
Replace quantity 192 custom made[S(1] castle nuts approximately two inch outside diameter by two inch long made from A564 UNS 17400 Type 630 Condition H1100 material (more commonly known as 17-4). Replace quantity 48 custom made U-bolts from 1-1/8-inch diameter rod bent to eighteen inches long with a six-inch radius made from A564 UNS 17400 Type 630 Condition H1100 material. Replace quantity eight custom U-bolt spacers approximately six inch outside diameter by twelve inch long made from self-lubricated composite material. Replace quantity eight gate connection pins approximately four-inch diameter by sixteen inch long made from A564 UNS 17400 Type 630 Condition H1100 material. Supply quantity one custom made installation tool approximately two inch outside diameter by ten inches long made from A564 UNS 17400 Type 630 Condition H1100 material for the custom castle nuts. After replacement of the gate connection components, the wire ropes of each gate will be tensioned to equal amounts from one side of the gate to the other so that the gate does not rub side walls under vertical travel and the gate contacts the spillway ogee evenly from one side to the other. The contractor will be responsible for the release and re-tensioning of wire ropes in the preparation and finishing of work activities. Anticipated Construction Schedule: USACE Portland District intends to advertise in November 2026 and award in December 2026. The contractor will use its discretion to select the appropriate work period given the restrictions relayed and present a proposed work schedule to USACE for approval. Estimated Construction Cost (ECC): The current ECC is between $1,000,000 and $5,000,000. Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels. Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 2 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.