Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherOpen

Mather Fueling System Repairs

DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST OMAHA

Response deadlineOct 14, 2026 4:00 PM EDT · 8 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 14, 2026 4:00 PM EDT · 8 days left
Posted
Sep 30, 2026 12:00 AM EDT
Notice type
Presolicitation
PSC
Y1GC — Construction Of Fuel Storage Buildings
Place of performance
Mather, CA, 95655
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
d0321795a6604faba55688cf6544907e
Solicitation number
W9128F27RA045PN

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 2, 2026 2:10 AM EDT.

This project involves modifying a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside.

Attachments

No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.

Contacts

Samuel Obrist
Primary
samuel.v.obrist@usace.army.mil
Phone: 4029952480
Dawn Barnett
Secondary
dawn.s.barnett@usace.army.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.