Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Hoisting & Rigging Equipment Support Services

ENERGY, DEPARTMENT OF › PRINCETON LAB - DOE CONTRACTOR

Response deadlineOct 20, 2026 4:00 PM EDT · 14 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 20, 2026 4:00 PM EDT · 14 days left
Posted
Sep 30, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
PSC
J039 — Maintenance, Repair and Rebuilding of Equipment: Materials Handling Equipment
Place of performance
Princeton, New Jersey
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
95542cb37c5f4ae489bf069ff8916b45
Solicitation number
RFP_26-081JR

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 2, 2026 2:10 AM EDT.

Princeton Plasma Physics Laboratory is looking to acquires PPPL personnel perform much of the routine required inspections; however, during peak workload periods and for large repairs, the Subcontractor may be called upon on to perform these tasks. This SOW provides the requirements for subcontracted periodic inspections. It also addresses the assignment to a Subcontractor of the requirement to perform remedial (corrective) maintenance, which may be determined necessary based upon the periodic inspections, in order to make a piece of equipment operable in accordance with governing codes and standards, and the performance of routine maintenance as recommended by the various equipment manufacturers. Unless specified and agreed to otherwise in writing, PPPL requires that the work be performed in accordance with the manufacturer specifications and procedures. After any maintenance is performed, a complete thorough check of equipment function shall be performed including all safety features and interlocks as described by the manufacturer. Additionally, the Subcontractor may be called upon for advice for crane upgrades and performance enhancements. Several large cranes (Items 3, 13, 33, 34 on Attachment A) are retrofitted with Catron/Electromotive radio remote controls and Variable Frequency Drives. Familiarity with and qualification in maintenance and adjustments of these cranes and control systems is mandatory. Subcontractor's membership in the Crane Manufacturers Association of America (CMAA) is regarded as highly desirable, and a measure of the Subcontractor's professionalism and technical qualification for performing tasks such as assigned under the Statement of Work.PPPL does not guarantee any minimum level of work and reserves the right to use other sources to perform the inspection and maintenance tasks when PPPL determines this to be appropriate A mandatory preproposal zoom meeting has been scheduled for 1:30 PM on 8 Oct 2026. Zoom invitations will only be sent to firms completing and submitting an RFP acknowledgement form

Attachments

12 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

JIMMY RUSSELL
Primary
jrussell@pppl.gov
Phone: 6092433963

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Review before pursuing

We found a requirement that may limit who can compete. Review the solicitation details before proceeding.

Detected in

  • Solicitation document“monetary wages and furnished the fringe benefits as are determined pursuant to the procedures in this paragraph (c). (ii) This conforming procedure shall be initiated by the Contractor prior to the performance of contrac”

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.