Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosing soon

J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS

VETERANS AFFAIRS, DEPARTMENT OF › 242-NETWORK CONTRACT OFFICE 02 (36C242)

Response deadlineAug 28, 2026 10:00 AM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Aug 28, 2026 10:00 AM EDT
Posted
Aug 25, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220
PSC
J045
Place of performance
Montrose, New York
Current status
Closing soon

Notice details

Official status
Closing soon
Normalized group
Bid opportunity
Notice ID
181c85ef0c8d442d8d70449c97d4fdb2
Solicitation number
36C24226Q0816

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 26, 2026 5:17 PM EDT.

The purpose of this amendment to the solicitation is to: 1. Extend response due date to 8/31/2026 at 10:00 AM ET. 2. Respond to questions. RFI 6 - Master Control Panel and SCADA Integration The propane header must interface with the existing Master Control Panel and SCADA system. During the walkthrough, MicroMod advised that the existing Master Control Panel has insufficient available I/O for the propane-system interface. MicroMod further advised that an upgraded Red Lion platform could be configured with the additional I/O and communications capability required for this integration. Requested VA Response: Please confirm whether the contract scope includes all required I/O hardware, Red Lion HMI or communications-platform upgrades, programming, graphics, and Master Control Panel/SCADA modifications necessary to provide a complete and operational propane-system interface. VA Response:  Contractor shall furnish and install an electro mechanical gas shut off valve (Maxon or approved equal) upstream of the fuel pressure regulator and downstream of the gas filter/strainer to protect the downstream safety shut off valves. The VA will provide at least one additional I/O module in the Boiler Plant Master control panel which will control the propane gas shut off valve. The contractor shall furnish and install the 110V power circuit from the I/O module to the propane gas shut off valve. The VA will provide the additional I/O prior to the completion of the contract work. RFI 7 - Boiler No. 2 Human-Machine Interface During the recent walkthrough, it was observed that the Boiler No. 2 control cabinet no longer has a functional Human-Machine Interface (HMI). A working HMI is required to interface with the existing MicroMod loop controllers and to configure, monitor, start up, test, and commission the Boiler No. 2 combustion-control system. A direct hardware swap is not adequate because current Red Lion models do not duplicate the obsolete unit's side-button arrangement; the existing screens and graphics must be re-engineered and converted for the new display. Requested VA Response: Please confirm whether the contract scope will be revised to include furnishing, engineering, programming, graphics conversion, installation, integration, testing, and commissioning of a new Red Lion HMI compatible with the existing MicroMod loop controllers and associated boiler-control equipment. Supporting Information: See Attachment E - Boiler No. 2 HMI Replacement. VA Response: The VA will have a new HMI installed prior to the completion of the contract work.

Attachments

21 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Natalie Acevedo
Primary — Contracting Officer
natalie.acevedo@va.gov
Phone: 718 584 9000 x4356

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document review incomplete

We analyzed part of the available solicitation material, but some documents remain unprocessed. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.